60–80%
Clash reduction
₹1–5 Cr
Rework cost avoidance
+15–20%
Schedule adherence
Challenges We Solve
- ✕2D CAD coordination causing costly on-site clashes
- ✕No single source of truth across design disciplines
- ✕Disconnected cost and schedule data from physical model
- ✕MEP coordination failures discovered during installation
What We Deliver
- Full LOD 100–500 BIM modeling
- Federated multi-discipline clash detection
- 4D construction sequencing
- 5D cost-linked BIM models
- IFC-compliant open standard deliverables
- BIM Execution Plan (BEP) development
Frequently Asked Questions
Ready to explore BIM for your construction project?
Talk to NexBuild — tell us your challenge and we'll outline the right approach.
Talk To NexBuild